Our Projects

No. Project Client Scope of Work
1 LaGuardia Airport Used a wall saw system on a mounted track to sawcut 10' x 10' wall openings through 24" thick reinforced concrete. Removed concrete pieces from the wall.
2 P.S.28Q Core drilled a 25" wall hole through a 16" foundation wall.
3 Hunters Point Library Used hydraulic hand saws to extend an existing elevator shaft opening.
4 Ritz Carlton General Contractor Hand sawed concrete floor slabs in order to expand existing duct openings.
5 Queens Center Mall Executive Building Development Core drilled floor holes of various sizes.
6 Montefiore Hospital Used wall saw to sawcut a 30" thick wall. Cut wall into sections that were then transported into garbage containers.
7 Bellevue Hospital Core drilled various 14" and 18" diameter holes through a concrete roof slab. Chopped out the cores and penetrated the floor dry in order to minimize water damage.
8 Del Frisco’s Grill Core drilled various 4" and 6" holes through a 12" thick floor slab
9 Williamsburg Library Core drilled wall holes in order to expose metal anchors which were located by AmeriscanGPR using ground penetrating radar technology.
10 Bay Park Sewage Treatment Plant Used push behind road saw to sawcut various trenches and floor openings